Everglades Challenge 2013
Well, we made it to the start and we made it to the finish. And, the boat made it with out any problems or failures. Our work paid off. Now we have an "EC Proven" boat. 5 days, 9 hours and 40min. Approx 300 miles. We encountered a variety of conditions, most of which were favorable - down wind or off the wind. Here are some pics. We'll have more to share on the race, soon.
|
Locked and loaded, time to roll |
|
On the beach, Mullet Key, day before start |
|
Looking down the line |
|
Check Point 1 |
|
Wing on Wing, Charlotte Harbor |
|
Check Point 2, Chokaloskee |
|
Leg 3, Sailing around Cape Sable |
|
Check point 3, Flamingo |
|
leg 4, between Flamingo and Key Largo |
|
At the finish, tied up, Key Largo |